5 Tips From Ricardo Vargas To Master A Work Breakdown Structure

Опубликовано: 17 Январь 2025
на канале: Ricardo Vargas
8,475
375

5 Tips From Ricardo Vargas To Master A Work Breakdown Structure

In this video, Ricardo shares tips for you to master the construction of the WBS for your project.

A Work Breakdown Structure (WBS) is a tool used in project management to break down a project into smaller, manageable sections called work packages. It organizes and defines the total scope of the project by representing the work specified in the currently approved project scope statement. Essentially, the WBS helps capture all project deliverables, providing a structured vision of what must be delivered. This structure makes assigning responsibilities, managing workloads, and tracking progress easier.

The video comes with a free download of the "5 Tips To Master A Work Breakdown Structure" primer at https://get.ricardo-vargas.com/5tipst...

LEARN MORE ABOUT MY ONLINE SCHOOL AT
https://learn.ricardo-vargas.com

IF YOU LIKE THIS VIDEO, SUBSCRIBE MY CHANNEL AT

https://rvarg.as/youtube

Table of content
00:00 Introduction
00:38 The Concept of WBS
02:25 Tip Number One
03:52 Tip Number Two
06:32 Tip Number Three
07:40 Tip Number Four
10:13 Tip Number Five
11:32 Example
13:49 Closing

5 Tips From Ricardo Vargas To Master A Work Breakdown Structure
Project Management
ricardo vargas pmp
pmp certification
ricardo Viana Vargas
project management skills
project management tools
agile methods
agile management
pmp exam
ricardo viana vargas phd
project management interview questions and answers
project management 101
project management construction
work breakdown structure example
WBS
Work Breakdown Structure
Scope Management
Scope
CAPM